Modern Upgrading & Maintaining of Rail Lines, MOW Combo
SKU: DVD-RWP-RLV-RAILCOMBOOriginal price was: $49.95.$44.95Current price is: $44.95.
Ever wondered how railroad tracks are maintained and upgraded? This combo will give you an up-close look at two different operations. Choose DVD or Blu-ray for this two show combo.
- Free Post Office shipping over $25!
- Free UPS shipping over $75!
Producer | Railway Productions |
---|---|
Run Time | 45 Minutes |
Narration | Yes |
Shrink Wrap | Yes, Brand New |
Technical Details | NTSC, Region Free, View Worldwide on Computer |
Have you ever wondered how railroad tracks are maintained and upgraded? Learn with these TWO SHOWS! A Rail Maintenance of Way Combo with shows from Railway Productions and R-Line video. This Combo Set is available in DVD or Blu-ray.
In Railway Productions’ “Laying Welded Rail”, join the Louisville & Indiana to see a railroad transformed from a 25mph line with jointed rail to a 50mph line with smooth, welded rail. You’ll see the entire process including:
* Dropping off the rail
* Tie inserting
* Welding the rail together
This is a great look at the rebuilding of a railroad line from the ground up.
What about when your track justĀ need refurbished? Let’s look at Norfolk Southern in R-Line’s video.
Crosstie replacement is a vital infrastructure maintenance project, but must be done without disrupting train schedules. In high traffic lanes where work windows are short, Norfolk Southern deploys its “Tie and Surfacing Super Gang”. An army of skilled crew members equipped with high-production, very specialized machines are deployed; old worn out ties are replaced, correct track geometry is restored and rock ballast is properly contoured. This rehabilitation is to be completed in the shortest period of time in order to keep the NS mainline open for traffic. In this program will show this process, identify the unique machines and the procedure to achieve these goals.
Reviews
There are no reviews yet.