Laying Welded Rail on the Louisville & Indiana
SKU: DVD-RWP-WELDOriginal price was: $29.95.$24.95Current price is: $24.95.
Ever wondered how railroad tracks are maintained and upgraded? Here you’ll see a railroad transformed from a 25mph line with jointed rail to a 50mph line with smooth, welded rail.
- Free Post Office shipping over $25!
- Free UPS shipping over $75!
Producer | Railway Productions |
---|---|
Run Time | 45 Minutes |
Narration | Yes |
Shrink Wrap | Yes, Brand New |
Technical Details | NTSC, Region Free, View Worldwide on Computer |
Have you ever wondered how railroad tracks are maintained and upgraded? In “Laying Welded Rail”, join the Louisville & Indiana to see a railroad transformed from a 25mph line with jointed rail to a 50mph line with smooth, welded rail. You’ll see the entire process including:
* Dropping off the rail
* Tie inserting
* Welding the rail together
This is a great look at the rebuilding of a railroad line from the ground up.
rickyfreni –
During summer break of 2017, the Louisville & Indiana railroad was rebuilding, and upgrading their entire line to a smooth ride. Various maintenance equipment from RJ corman is included as well as other construction machines such as the John Deere 210C excavator, and another excavator, which is the caterpillar 320E. Some CSX freights are included, which includes an all BNSF power at the end of the show.