Laying Welded Rail on the Louisville & Indiana

(1 customer review)

$29.95 $24.95

Have you ever wondered how railroad tracks are maintained and upgraded? In “Laying Welded Rail”, you’ll see a railroad transformed from a 25mph line with jointed rail to a 50mph line with smooth, welded rail.

For more about this product, click on the tabs below.

Clear

SKU: DVD-RWP-WELD Categories: ,

Have you ever wondered how railroad tracks are maintained and upgraded? In “Laying Welded Rail”, join the Louisville & Indiana to see a railroad transformed from a 25mph line with jointed rail to a 50mph line with smooth, welded rail.  You’ll see the entire process including:

  • Dropping off the rail
  • Undercutting
  • Tamping
  • Tie inserting
  • Welding the rail together
  • Surfacing

This is a great look at the rebuilding of a railroad line from the ground up.

Run Time

Producer

Technical Details

Year Published

Shrink Wrapped

1 review for Laying Welded Rail on the Louisville & Indiana

  1. rickyfreni

    During summer break of 2017, the Louisville & Indiana railroad was rebuilding, and upgrading their entire line to a smooth ride. Various maintenance equipment from RJ corman is included as well as other construction machines such as the John Deere 210C excavator, and another excavator, which is the caterpillar 320E. Some CSX freights are included, which includes an all BNSF power at the end of the show.

Add a review

Your email address will not be published.

You may also like…

Scroll to Top