Conrail’s Conclusion, Water Level Route, Part 3, Cleveland to Toledo

SKU: DVD-CBP-CRWL3
(2 customer reviews)

$24.95

This is the busy Water Level Route from Berea Tower near Cleveland, to Millbury Jct on Toledo’s east side. Part 3 of the 4 part Water Level series.

In stock

Purchase this product now and earn 100 Points!
  • Check Mark Free Post Office shipping over $25!
  • Check Mark Free UPS shipping over $75!
Producer

Clear Block Productions

Run Time

1 hour 40 minutes

Narration

Yes

Shrink Wrap

Yes, Brand New

This is the busy Water Level Route from Berea Tower near Cleveland, to Millbury Jct on Toledo’s east side. Locations visited include Elyria, Huron, Vermillion, Sandusky, Sandusky Bay drawbridge, Port Clinton, CO Drawbridge, Oak Harbor, Rocky Ridge, Graytown, and Millbury Junction. Intermodal, ML trains, and general freight make up the bulk of the traffic, along with coal and Amtrak. Foreign power includes CSX, NS, ATSF, and WC.

2 reviews for Conrail’s Conclusion, Water Level Route, Part 3, Cleveland to Toledo

  1. Jim

    This video starts in Berea but with NS and CSX. After that, it’s all CR. There are other railroads locos and Amtrak shown along with multiple train meets. Narration is minimal while locations and direction are shown with text on the screen. Shots are made from various angles not just at trackside. Some trains are shows in their entirety while other cut to the end. This video, as with other Conrail Conclusion videos, are excellent and highly recommended.

  2. Aw

    Lots of scenic views along lake Erie. I love the water front scenes. Clear Blocks Conrail Conclusion is one of the best video series ever put together. This is one of those. I think Clear Block Productions was one of the best producers on the market. It is a shame that he didn’t get to produce more videos.

Add a review

Your email address will not be published. Required fields are marked *